DIGITAL TWINNING EXAMPLES

Challenges | Solutions | Results

Where are my bottlenecks?

Challenges

Low performance of manual assembly line
Raw material supply, unpredictable line issues, operator allocations, line conversions together are complex for standard planning

Solution

  • High fidelity simulation model including all manual and automated operations
  • New operator and material buffering logics built in the system
  • Both 2D and 3D model of the line has been built

Results

System bottleneck was identified
Improvement ideas indicate a capacity potential of 21%
Downtime reduction potentials have been assessed