DIGITAL TWINNING EXAMPLES
Challenges | Solutions | Results
Where are my bottlenecks?
Challenges
Low performance of manual assembly line
Raw material supply, unpredictable line issues, operator allocations, line conversions together are complex for standard planning
Solution
- High fidelity simulation model including all manual and automated operations
- New operator and material buffering logics built in the system
- Both 2D and 3D model of the line has been built
Results
System bottleneck was identified
Improvement ideas indicate a capacity potential of 21%
Downtime reduction potentials have been assessed