DIGITAL TWINNING EXAMPLES
Challenges | Solutions | Results
Better design your factory – full factory simulation
Challenges
Due to space constraint and the overall construction and installation costs, the best operations strategies are sought to maximum use of existing assets.
Validate expected capacity & utilization base on strategic planning of product mix, Identify bottleneck operations.
Solution
- Multi-layer full factory simulation model with high fidelity
- Rough-cut capacity & bottleneck analysis and started bringing values
- Provided dynamic view of production ramp and potential bottlenecks
Results
Highlighted best buffering strategy for optimum line-balancing
Identified capacity gap for a specific processes
Verified new auto-line design risk vs. capacity plan